![](/images/site/capital-precast-arrow-left-icon.png)
![](/images/site/capital-precast-arrow-right-icon.png)
Westpointe Sewer Extension
Description:
Westpointe Sewer Extension is a 3/4 + mile job that is connecting a new 700 home development on the South West side of San Antonio to existing sanitary infrastructure. Close to 1000 pipe cradles that Capital Precast LLC provided for this project.